42m (rebelay allows 30m pitch)
Public access
8hr30min
6 pitches down a main river gorge with high flows, big jumps and challenging swims.
42m (rebelay allows 30m pitch)
Public access
8hr30min
6 pitches down a main river gorge with high flows, big jumps and challenging swims.
35m/40m/70m (2x60m)
3-6hrs
Public access
A long alpine canyon (3 sections), with good access and great views accross to Mt Rolleston.
50m
4h45min
Public access
Steep and inescapable after the first drop. Some very beautiful waterfalls, very sheer and steep rock walls and views to Mt Rolleston.
75m
8hr30min
Public access
Halpin Creek is a steep alpine descent. Its scenic approach and descent has impressive views of the peaks and valleys of Arthur’s Pass. The finale is a long, exposed pitch with some sharp rock near the top requiring care — another adventure right off the highway.